About Us Advertise Careers Contact Us Privacy Policy Community Guidelines
Locating… 13°C English WhatsApp Alerts Email Alerts
BREAKING NEWS
Senate Appropriators Release $1.072 Trillion Defense Bill New Album of Baby Star Sounds Shared by NASA’s Chandra NASA to Cover 35th SpaceX Resupply Mission Space Station Departure The data is very preliminary, but Vulcan failure may not be due to BE-4 engines From Bhutan to Sri Lanka — Passing the Baton towards Zero by 30 - World Health Organization (WHO) Diabetes Linked to Chronic Kidney Disease in Western Sri Lanka Study - Bioengineer.org Sri Lanka collapses to 98 all out, Pakistan reaches 121-3 in 2nd test - Oskaloosa Herald icc-fines-pakistan-and-sri-lanka-for-slow-over-rate-in-first-test-deducts-wtc-points Archives - TV ONE USA Rocket Lab’s Electron completes 100th mission, Neutron progresses toward debut mission NASA Launches Nuclear Power Systems Student Contest
SRI LANKA NEWS

Edotco deploys shared backup power systems for Sri Lankan telcos - Developing Telecoms

Lanka Hit News • Dec 29, 2025 · 10mo ago • 2 min read
Share:

We would like to use analytics cookies (Google Analytics) to see how visitors use our site, so we can improve it. These are only set if you accept. Cookies the site needs to work are always on. Privacy policy

Edotco Services Lanka says it has commissioned 400 resilient power systems across Sri Lanka to strengthen telecoms network reliability and resilience during natural disasters and prolonged power outages.

The power systems have been deployed as shared infrastructure, supporting the island’s three mobile operators – Dialog Axiata, Hutch and SLT-Mobitel – to improve efficiency and reduce duplication.

Each system includes extended battery backup, rectifiers, standby generators, associated cabins, and alternate power modules, and is engineered with defined mean time to respond (MTTR) targets to enable rapid restoration during outages.

Edotco Sri Lanka said the initiative, announced just before Christmas, represents an investment of LKR500 million (around US$1.7 million) and aims to ensure service continuity at mission-critical telecom sites during grid failures, extreme weather events, and national emergencies.

The rollout comes in the aftermath of last month’s Cyclone Ditwah , which brought extreme rainfall and triggered severe flooding and landslides across the country, affecting 2.3 million people, and disrupting power and communications infrastructure.

Over 2,000 telecom sites were impacted by the storm, leaving several districts without mobile and data services for anywhere from two to five days. Edotco said network outages were mainly caused by prolonged grid power failures, fibre cut due to floods and landslides, site flooding in low-lying areas, and restricted access that delayed restoration efforts.

Edotco said it plans to scale the deployment to 1,000 sites by the middle of next year, investing a total of approximately LKR 1.2 billion.

“Cyclone Ditwah made it clear that power resilience is the weakest link in network continuity and we must change how telecom infrastructure is designed and operated” said Gayan Koralage, Country MD for Edotco Sri Lanka. “Power resilience is no longer optional. It is the backbone of national digital resilience.”

“The recent floods were a stark reminder that telecommunications is no longer just a commercial service – it is a national lifeline during emergencies,” said Air Vice Marshal Bandula Hearth (retd.), director general of the Telecommunications Regulatory Commission of Sri Lanka (TRCSL). “Strengthening power resilience and redundancy at network sites is essential to safeguard public safety, emergency coordination, and economic continuity as climate risks intensify.”

Company registered in England, number 5724661

All content copyright © 2005-2026 Developing Telecoms Ltd. All rights reserved.

Join the Conversation